Galvanized sheet
Key words:
The galvanized sheet production line #2 of the company was initially built in 2013 and started operation in February 2014. Designed to run at a speed of 200 meters per minute, this line has an annual production capacity of 350,000 tons, producing sheets with thicknesses from 0.12mm to 0.6mm and widths of 700mm to 1250mm.
Key words:
The galvanized sheet production line #2 of the company was initially built in 2013 and started operation in February 2014. Designed to run at a speed of 200 meters per minute, this line has an annual production capacity of 350,000 tons, producing sheets with thicknesses from 0.12mm to 0.6mm and widths of 700mm to 1250mm.
Key words:
Furthermore, the galvanized sheet production line #1 of the company, also built in 2009 and began production in May 2010, is designed to operate at 180 meters per minute with an annual production capability of 300,000 tons.
Key words:
The galvanized sheet production line #2 of the company was initially built in 2013 and started operation in February 2014. Designed to run at a speed of 200 meters per minute, this line has an annual production capacity of 350,000 tons, producing sheets with thicknesses from 0.12mm to 0.6mm and widths of 700mm to 1250mm.
Key words: